Covered under standard installation
- Installation services (our delivery team will reach out to schedule your delivery and installation as per the available slots)
- Basic product overview/demonstration
- Standard wire/pipe length is provided by the brand/manufacturer
- Refrigerator’s power source must be switched on no sooner than 2 hours after installation to allow refrigerator gas to settle.
- 15-day free on-site repairs for installation related issues
Not covered under standard installation
- Electrical wiring extension, additional base stand installation or any other electrical work
- Transformer or any other voltage rating adjustments
- Additional installation material
- Dismantling/relocation of old refrigerator units
Pre-installation site readiness
- Plug/plug point with suitable wiring and voltage rating within 1.5 meters of the refrigerator unit
- Permission obtained to carry out delivery and installation prior to scheduling the service
- Space has been prepped and cleared for installation
- If a new unit is installed in place of an older unit, the older unit must be removed