Covered under standard installation:
- Installation by our delivery team, based on available slots
- Mounting indoor and outdoor units, drilling holes in walls, and routing pipes between them
- Installing copper and drainage pipes, and connecting units using standard wire/pipe lengths
- Basic cooling performance check and product demonstration
- Installation charges listed under 'Shipping fees'
- ODU installations on/above 2nd floor units must be floor-mounted
- Free on-site repairs for installation-related issues within 15 days
Not covered under standard installation:
- Changes to existing wiring or sockets
- Transformer/voltage adjustments
- Dismantling/relocating old AC units
- Pre-installation site readiness (plug point, space clearance)
- Scaffolding or accessibility for ODU installation
- Permission for delivery/installation scheduling
- Relocation of older AC units if installing a new one